Source of raw materials:

This process is applied for precious lead and bismuth alloy with Ag content <15% and Cu content<2%. The main sources for the raw materials are:

  1. Precious lead alloy of lead anode slime smelting from traditional lead smelting plant;
  2. Precious lead alloy of electrolytic anode slime with high bismuth and lead;
  3. Crude bismuth alloy;
  4. Other crude lead and bismuth alloy with Ag content;


This process is applied for precious lead-base alloy and bismuth-base alloy with high Ag and Cu content and alloy melting point greater than 600 . The main sources for the raw materials are:

  1. Precious lead smelting slags and blowing Ag-Cu-Bi alloy from traditional lead smelting plant; Precious bismuth smelting slags ;
  2. Precious lead from copper anode slime ;
  3. Hydrometallurgical slag smelting alloy during the nickel smelting.
  4. Other lead-base alloy and bismuth-base alloy with high Ag and Cu content

Technological characteristics and finished product indexes:

Brief introduction to continuous vacuum treatment process for precious lead and bismuth

Product 1(vacuum crude silver alloy)

Pb<1%, Bi<1%

Product 2 (vacuum crude lead and bismuth alloy)

Ag<5g/t (or 40g/t), Cu<3g/t

Equipment capacity

8-12tons/24 hrs

Electric power consumption

550—650kwh per ton of material

Labour consumption

1-2 people per shift


Product 1(vacuum crude copper alloy

Pb<1%, Bi<1% and Ag<0.3%

Product 2(vacuum precious lead and bismuth alloy)

Cu<0.5%(To continuous vacuum treatment process)

Equipment capacity

0.5-1ton/furnace

Electric power consumption

1000-1500kwh per ton of material

Labour consumption

flexible


Technical advantages of precious lead vacuum treatment

  1. Can remove lead, bismuth and antimony and reduce the silver separating furnace blowing and slag production;
  2. Has big equipment production capacity, can shorten the production period of silver separation process and increase the output rate of silver;
  3. Produce lead, bismuth and antimony in the form of alloy, depending on the content of components, directly high bismuth-lead electrolysis or antimony removal process can be applied.
  4. Generally high direct recovery rate of element vacuum treatment, less mechanical adhesion loss, high metal comprehensive recovery rate;


Technical advantages of precious bismuth vacuum treatment

  1. Completely replace the process of zinc-adding to remove silver during the bismuth refining process, eliminate zinc consumption, and no silver and zinc slags generated, reduce production costs;
  2. Have big equipment production capacity, can greatly reduce the refining time;
  3. Generally high direct recovery rate of element vacuum treatment, less mechanical adhesion loss, and high metal comprehensive recovery rate;
  4. High degree of automation, more stable product quality, low labor intensity and small labor consumption.


Any questions for technology or equipment,please contact us

Project in Neimenggu, China

Raw Material: Pb-Bi-Ag-Cu Alloy

Furnace type: DBLJ03-700 type,3 sets

Furnace condition: 17th December 2018 finish installation and commissioning.

Brief Introduction
Project in Henan, China

Raw Material: Pb-Ag alloy and other materials with Au and Ag

Furnace type: 

    DBLJ03-700    7 sets 

    DBLl03-10      1 set

Furnace condition: 12th August 2019 finish installation and commissioning of the 7th furnace.

Brief Introduction
Peject in Anhui, China

Raw Material: Pb-Bi anode slime

Furnace type: DBLJ03-700 type,1 set

Furnace condition: 8th April 2020 finish installation and commissioning.

Brief Introduction
Project in Fujian, China

Furnace Model: DBLJ03-800

Material: Pb-Bi alloy Pb-Ag alloy and other materials with Au and Ag 

Capacity: 1 t/batch

Amount: 

    2 sets    May, 2019

Brief Introduction

Products list

CHINA HEADQUARTERS

Add:B1-2,Sunshine 100 New City,Yuelu,Changsha,Hunan,China. 

Tel:86 0731 82290294

Cellphone:86 18207409461

Whats/Wechat:18207409461

Email:info@vdepic.com


RESEARCH AND PRODUCTION CENTER

Add:Venture Building, No. 296, Xuefu Road, Kunming City, Yunnan Province, P.R. C.

Tel:0086-871-65820997

Fax:0086-871-65820786

CONTACT US